Roof replacement

A new roof that starts under the old one

We take the roof to the deck, check the wood, check the attic, then build it back with vents that actually move air.

  • Shingle or standing-seam metal

  • New underlayment, drip edge and flashing

  • Soffit and ridge vents set to the attic's size

  • Magnet sweep of the yard before we leave

Rows of weathered grey roof shingles filling the frame

The job

Tear-off to cleanup, in five steps

  1. 01

    Step 1: Attic first

    Uriel checks the vents, the baffles and the underside of the deck before anything comes off.

  2. 02

    Step 2: Tear-off

    Genaro's crew strips to the deck. Tarps cover the house and the plants, and nails go in a magnet bin.

  3. 03

    Step 3: Deck check

    Soft or split sheets are replaced at the price per sheet already in your estimate.

  4. 04

    Step 4: Dry-in and build back

    Underlayment, flashing, then shingle or metal, with the vents that were planned.

  5. 05

    Step 5: Walk-through

    Dalila walks the finished roof and the attic with you and answers what is left.

About replacement

How long does a replacement take?

Most houses take a few days if the weather holds. The estimate gives the crew's plan, and we call if rain moves it.

Can you put new shingles over old ones?

We tear off. Going over old layers hides the deck and the attic from view, and that is what we are there to check.

Will the new roof come with a warranty?

The estimate says in writing what the workmanship warranty covers, for how long, and what voids it. The shingle maker's warranty is separate and comes from the maker.

Ready for the attic check?

It comes before any roof number.